Worker beside the trailer securement of a wrapped chiller, with a crane and truck nearby
DATA CENTER EQUIPMENT LOGISTICS

Critical equipment. Coordinated from pickup to delivery.

Moving chiller components, generators, fuel tanks or battery cells? Werner helps coordinate the freight around your equipment, your delivery requirements and your project schedule.

Werner Air Freight · We don’t sleep so you can.Equipment details. Clear handoffs. Reachable people.
Wrapped chiller at trailer securement
OPERATIONS STAFFED 24/7/365
US · CANADA · MEXICO · INTERNATIONAL AIR
ONE POINT OF CONTACT
KEEP YOUR PROJECT MOVING

The delivery is part of a bigger plan.

Equipment readiness, a changing delivery window, a site with specific access requirements. Those details can affect the work waiting at the other end. You need a transportation conversation that brings them together, not another uncertainty to manage.

Werner is the reachable coordinating team. We work through the shipment requirements with you and transportation partners, so the pickup and receiving handoffs are clearer.

Get to know Werner
DATA CENTER MOVEMENTS

Built around what needs to move.

Data center logistics
01

Chiller components

Packed assemblies, dimensions and connection-point protection.

Discuss equipment
02

Generators

Weight, packaging, shipment condition and loading arrangements.

Discuss equipment
03

Fuel tanks

New or used, current contents and residue status for review.

Discuss equipment
04

Battery cells

Chemistry if known, arrangement, packaging and condition.

Discuss equipment
05

Other project equipment

Tell us what needs to move and what the site requires.

Discuss equipment

Battery cells and fuel tanks require shipment-specific review of condition, packaging and contents. No blanket acceptance is implied.

A PRACTICAL WAY FORWARD

Clearer details. Coordinated handoffs.

01

Share the shipment details

Start with the equipment, origin, destination and timing. Share dimensions, weight and handling instructions if available, and flag what is still unknown.

02

Work through the movement plan

Discuss transportation options, site access and who handles loading and unloading. Confirm availability and responsibilities with the team.

03

Coordinate pickup and delivery

Keep in contact as pickup and receiving arrangements are coordinated. Share changes to the schedule or site instructions with operations.

Industrial generator secured on a blue trailer
Generator secured on a trailer
PROJECT EQUIPMENT / TRANSPORTATION01 to 05
01 / Pickup02 / Transportation03 / Delivery
Illustrative equipment · Shipment requirements confirmed individually
Wrapped jet engine on an orange transport stand on a trailer inside a hangar
Aviation logistics · Jet engine transport
ALSO FOCUSED ON AVIATION

Jet engines. Aviation components. Care in the details.

Transport stands, crating, handling instructions and timing shape an aviation shipment. Werner coordinates transportation around those details through service partners, with a team you can reach.

Aviation & jet engine transport
SELECTED PROJECT MOVEMENTS

Equipment in movement.

Silent video: workers handle a tarp around equipment on a trailer, with close-up securement and forklift handling shots.

Generator handling and preparation

A closer look at equipment preparation, securement and handling during a generator movement.

Chiller on a lowboy trailer outdoors

Chiller transport

A chiller on a lowboy trailer. Packed dimensions and loading access shape the equipment discussion.

Wrapped jet engine on an orange transport stand on a trailer inside a hangar

Jet engine preparation

A wrapped engine on its transport stand. Share stand details and handling instructions before pickup.

LET’S GET IT MOVING

Your equipment. Your requirements.
Let’s coordinate the next step.

Start with the shipment. Our team will confirm the options, availability and plan that fit your requirements.